.

Traffic re-arrangement options at western end of the Rong Bridge

DA NANG Today
Published: October 11, 2017

Following recent instructions from the Da Nang People’s Committee, the municipal Department of Transportation has cooperated with several relevant local agencies and consultancy units to develop options for re-arranging the traffic network at the western end of the Rong (Dragon) Bridge.

The intention is to ease traffic congestion at the intersection during peak hours, and to satisfy the city’s future traffic development strategies.

DA NANG Today would like to share with our readers 3D videos about the traffic re-arrangement options.

.
.

An option by a joint venture between the BK Engineering and Construction Company, and the Nippon Sokki Company Limited.

.
.

Another one by a joint venture between the Transport Engineering Consulting Company No 5 (TECCO5), the Transport Engineering Design Inc. (TEDI), and international consultant James Tinnion-Morgan from the UK-based Cevitrans Company.

 

.
.
.
.