.

New traffic arrangement around construction site at western end of Tran Thi Ly Bridge

By DA NANG Today / DA NANG Today
December 22, 2020, 11:32 [GMT+7]

The Da Nang government has approved new traffic arrangement plans around the construction site at the western end of the Tran Thi Ly Bridge with the aim to ensure smooth traffic whilst facilitating the progress of this the building of 3-level overpass project there.     

Traffic flow restrictions are put in place on the route: Trung Nu Vuong - Duy Tan - Nui Thanh - Nguyen Son Tra - 2 September - a section of Tran Thi Ly between its intersection of Tran Thi Ly Bridge and the roundabout of Ngo Quyen and Nguyen Van Thoai - Tran Thi Ly Bridge - extended Bach Dang - Binh Minh 6 - Phan Thanh Tai - Trung Nu Vuong.

In detail, all vehicles are banned from travelling around the clock along a road running behind wedding venues facing 2 September Street, and the extended Nguyen Son Tra Street.

Over 16-seater tourist coaches are not allowed to travel at all times on Tran Thi Ly Street, a section of Duy Tan between its intersections with Trung Nu Vuong and Nui Thanh, a section of Hoang Dieu between its intersections with Trung Nu Vuong and Duy Tan, and a section of Le Dinh Tham between its intersections with Trung Nu Vuong and Duy Tan.

Travel restrictions are placed on over 16-seater tourist coaches for travelling on a section of Trung Nu Vuong between its intersections with Duy Tan and Nui Thanh during peak hours from 6.30am to 8.30am, and from 4.00pm to 7.00pm.

A 24/7 travel ban is imposed on all vehicles for travelling near the intersections of Tran Thi Ly and extended Bach Dang streets.

Parking is prohibited along a section of Nui Thanh between its intersections with Duy Tan and Nguyen Son Tra streets from 6.00am to 10.00pm every day.

All vehicles travelling around the site of the traffic re-arrangement at the western end of the Tran Thi Ly Bridge are required to follow traffic signs.

Traffic police are assigned to be on duty at the intersections of Duy Tan and Trung Nu Vuong, Duy Tan and Le Dinh Tham, Duy Tan and Hoang Dieu, Duy Tan and Nui Thanh, Tran Thi Ly Bridge and 2 September, 2 September and Tieu La, 2 September and Nguyen Son Tra, and Nui Thanh and Tieu La in order to regulate traffic to ensure the safety of road users.

By THANH LAN - Translated by M.D

.
.
.
.